A ferry service began as early as 1820, with a regularly scheduled service beginning in the 1840s for the purpose of transporting water to San Francisco. The Sausalito Land and Ferry Company service, launched in 1867, eventually became the Golden Gate Ferry Company, a Southern Pacific Railroad subsidiary, the largest ferry operation in the world by the late 1920s.
A ferry service began as early as 1820, with a regularly scheduled service beginning in the 1840s for the purpose of transporting water to San Francisco. The Sausalito Land and Ferry Company service, launched in 1867, eventually became the Golden Gate Ferry Company, a Southern Pacific Railroad subsidiary, the largest ferry operation in the world by the late 1920s.
A ferry service began as early as 1820, with a regularly scheduled service beginning in the 1840s for the purpose of transporting water to San Francisco. The Sausalito Land and Ferry Company service, launched in 1867, eventually became the Golden Gate Ferry Company, a Southern Pacific Railroad subsidiary, the largest ferry operation in the world by the late 1920s.
Experts said that ferocious winds and blinding fogs would prevent construction and operation. ===Conception=== Although the idea of a bridge spanning the Golden Gate was not new, the proposal that eventually took hold was made in a 1916 San Francisco Bulletin article by former engineering student James Wilkins.
It was initially designed by engineer Joseph Strauss in 1917.
Another ally was the fledgling automobile industry, which supported the development of roads and bridges to increase demand for automobiles. The bridge's name was first used when the project was initially discussed in 1917 by M.M.
A ferry service began as early as 1820, with a regularly scheduled service beginning in the 1840s for the purpose of transporting water to San Francisco. The Sausalito Land and Ferry Company service, launched in 1867, eventually became the Golden Gate Ferry Company, a Southern Pacific Railroad subsidiary, the largest ferry operation in the world by the late 1920s.
The name became official with the passage of the Golden Gate Bridge and Highway District Act by the state legislature in 1923, creating a special district to design, build and finance the bridge.
Southern Pacific Railroad, one of the most powerful business interests in California, opposed the bridge as competition to its ferry fleet and filed a lawsuit against the project, leading to a mass boycott of the ferry service. In May 1924, Colonel Herbert Deakyne held the second hearing on the Bridge on behalf of the Secretary of War in a request to use federal land for construction.
In May 2007, the Golden Gate Bridge District issued a formal report on 70 years of stewardship of the famous bridge and decided to give Ellis major credit for the design of the bridge. ===Finance=== The Golden Gate Bridge and Highway District, authorized by an act of the California Legislature, was incorporated in 1928 as the official entity to design, construct, and finance the Golden Gate Bridge.
However, after the Wall Street Crash of 1929, the District was unable to raise the construction funds, so it lobbied for a $30 million bond measure (equivalent to $ million today).
The bonds were approved in November 1930, by votes in the counties affected by the bridge.
In November 1931, Strauss fired Ellis and replaced him with a former subordinate, Clifford Paine, ostensibly for wasting too much money sending telegrams back and forth to Moisseiff.
However, the District was unable to sell the bonds until 1932, when Amadeo Giannini, the founder of San Francisco–based Bank of America, agreed on behalf of his bank to buy the entire issue in order to help the local economy. ===Construction=== Construction began on January 5, 1933.
However, the District was unable to sell the bonds until 1932, when Amadeo Giannini, the founder of San Francisco–based Bank of America, agreed on behalf of his bank to buy the entire issue in order to help the local economy. ===Construction=== Construction began on January 5, 1933.
Although the retrofit was initially planned to be completed in 2012, it was expected to take several more years. The former elevated approach to the Golden Gate Bridge through the San Francisco Presidio, known as Doyle Drive, dated to 1933 and was named after Frank P.
Of eleven men killed from falls during construction, ten were killed on February 17, 1937, when the bridge was near completion and the net failed under the stress of a scaffold that had fallen.
Nineteen others who were saved by the net over the course of construction became members of the Half Way to Hell Club. The project was finished and opened on May 27, 1937.
This deck replacement was the bridge's greatest engineering project since it was built and cost over $68 million. ===Opening festivities, and 50th and 75th anniversaries=== The bridge-opening celebration began on May 27, 1937, and lasted for one week.
Three species of cetaceans (whales) that had been absent in the area for many years have shown recent recoveries/(re)colonizations in the vicinity of the bridge; researchers studying them have encouraged stronger protections and recommended that the public watch them from the bridge or from land, or use a local whale watching operator. === Tolls === When the Golden Gate Bridge opened in 1937, the toll was 50cents per car (equivalent to $ in ), collected in each direction.
The Bridge Round House, an Art Deco design by Alfred Finnila completed in 1938, has been popular throughout the years as a starting point for various commercial tours of the bridge and an unofficial gift shop.
This bracing stiffened the bridge deck in torsion so that it would better resist the types of twisting that had destroyed the Tacoma Narrows Bridge in 1940. ===Bridge deck replacement (1982–1986)=== The original bridge used a concrete deck.
In 1950 it was reduced to 40cents each way ($ in ), then lowered to 25cents in 1955 ($ in ).
With the death of Jack Balestreri in April 2012, all workers involved in the original construction are now deceased. ===Torsional bracing retrofit=== On December 1, 1951, a windstorm revealed swaying and rolling instabilities of the bridge, resulting in its closure.
Until 2008, the bridge was closed because of weather conditions only three times: on December 1, 1951, because of gusts of ; on December 23, 1982, because of winds of ; and on December 3, 1983, because of wind gusts of .
In 1953 and 1954, the bridge was retrofitted with lateral and diagonal bracing that connected the lower chords of the two side trusses.
In 1953 and 1954, the bridge was retrofitted with lateral and diagonal bracing that connected the lower chords of the two side trusses.
A statue of Strauss was moved in 1955 to a site near the bridge. In May 1987, as part of the 50th anniversary celebration, the Golden Gate Bridge district again closed the bridge to automobile traffic and allowed pedestrians to cross the bridge.
In 1950 it was reduced to 40cents each way ($ in ), then lowered to 25cents in 1955 ($ in ).
Each of the bridge's two towers has approximately 600,000 rivets. In the 1960s, when the Bay Area Rapid Transit system (BART) was being planned, the engineering community had conflicting opinions about the feasibility of running train tracks north to Marin County over the bridge.
In June 1961, consultants hired by BART completed a study that determined the bridge's suspension section was capable of supporting service on a new lower deck.
In July 1961, one of the bridge's consulting engineers, Clifford Paine, disagreed with their conclusion.
In January 1962, due to more conflicting reports on feasibility, the bridge's board of directors appointed an engineering review board to analyze all the reports.
The review board's report, released in April 1962, concluded that running BART on the bridge was not advisable. ==Aesthetics== Aesthetics was the foremost reason why the first design of Joseph Strauss was rejected.
Since 1964 its main span length has been surpassed by seventeen bridges; it now has the second-longest main span in the Americas, after the Verrazzano-Narrows Bridge in New York City.
During off-peak periods and weekends, traffic is split with three lanes in each direction. From 1968 to 2015, opposing traffic was separated by small, plastic pylons; during that time, there were 16 fatalities resulting from 128 head-on collisions.
In 1968, the bridge was converted to only collect tolls from southbound traffic, with the toll amount reset back to 50cents ($ in ). The last of the construction bonds were retired in 1971, with $35 million (equivalent to $M in ) in principal and nearly $39 million ($M in ) in interest raised entirely from bridge tolls.
In 1968, the bridge was converted to only collect tolls from southbound traffic, with the toll amount reset back to 50cents ($ in ). The last of the construction bonds were retired in 1971, with $35 million (equivalent to $M in ) in principal and nearly $39 million ($M in ) in interest raised entirely from bridge tolls.
Although there had been discussion concerning the installation of a movable barrier since the 1980s, only in March 2005 did the Bridge Board of Directors commit to finding funding to complete the $2 million study required prior to the installation of a movable median barrier.
From 1982 to 1986, the original bridge deck, in 747 sections, was systematically replaced with a 40% lighter, and stronger, steel orthotropic deck panels, over 401 nights without closing the roadway completely to traffic.
Until 2008, the bridge was closed because of weather conditions only three times: on December 1, 1951, because of gusts of ; on December 23, 1982, because of winds of ; and on December 3, 1983, because of wind gusts of .
To improve safety, the speed limit on the Golden Gate Bridge was reduced from on October 1, 1983.
Until 2008, the bridge was closed because of weather conditions only three times: on December 1, 1951, because of gusts of ; on December 23, 1982, because of winds of ; and on December 3, 1983, because of wind gusts of .
From 1982 to 1986, the original bridge deck, in 747 sections, was systematically replaced with a 40% lighter, and stronger, steel orthotropic deck panels, over 401 nights without closing the roadway completely to traffic.
A statue of Strauss was moved in 1955 to a site near the bridge. In May 1987, as part of the 50th anniversary celebration, the Golden Gate Bridge district again closed the bridge to automobile traffic and allowed pedestrians to cross the bridge.
Since 1990, acrylic topcoats have been used instead for air-quality reasons.
Tolls continued to be collected and subsequently incrementally raised; by 1991, the toll was $3.00 (equivalent to $ in ). The bridge began accepting tolls via the FasTrak electronic toll collection system in 2002, with $4 tolls for FasTrak users and $5 for those paying cash (equivalent to $ and $ respectively in ).
The total length of the Golden Gate Bridge from abutment to abutment is . The Golden Gate Bridge's clearance above high water averages while its towers, at above the water, were the world's tallest on a suspension bridge until 1993 when it was surpassed by the Mezcala Bridge, in Mexico. The weight of the roadway is hung from 250 pairs of vertical suspender ropes, which are attached to two main cables.
The program was completed in 1995 and it is now maintained by 38 painters who touch up the paintwork where it becomes seriously corroded. The ongoing maintenance task of painting the bridge is continuous. ==Traffic== Most maps and signage mark the bridge as part of the concurrency between U.S.
In 1999, it was ranked fifth on the List of America's Favorite Architecture by the American Institute of Architects. The color of the bridge is officially an orange vermilion called international orange.
Tolls continued to be collected and subsequently incrementally raised; by 1991, the toll was $3.00 (equivalent to $ in ). The bridge began accepting tolls via the FasTrak electronic toll collection system in 2002, with $4 tolls for FasTrak users and $5 for those paying cash (equivalent to $ and $ respectively in ).
Although there had been discussion concerning the installation of a movable barrier since the 1980s, only in March 2005 did the Bridge Board of Directors commit to finding funding to complete the $2 million study required prior to the installation of a movable median barrier.
In November 2006, the Golden Gate Bridge, Highway and Transportation District recommended a corporate sponsorship program for the bridge to address its operating deficit, projected at $80 million over five years.
In May 2007, the Golden Gate Bridge District issued a formal report on 70 years of stewardship of the famous bridge and decided to give Ellis major credit for the design of the bridge. ===Finance=== The Golden Gate Bridge and Highway District, authorized by an act of the California Legislature, was incorporated in 1928 as the official entity to design, construct, and finance the Golden Gate Bridge.
In October 2007, the Board unanimously voted to discontinue the proposal and seek additional revenue through other means, most likely a toll increase.
The District later increased the toll amounts in 2008 to $5 for FasTrak users and $6 to those paying cash (equivalent to $ and $ respectively in ). In an effort to save $19.2 million over the following 10 years, the Golden Gate District voted in January 2011 to eliminate all toll takers by 2012 and use only open road tolling.
As a condition of the grant, the congestion toll was to be in place by September 2009. In August 2008, transportation officials ended the congestion pricing program in favor of varying rates for metered parking along the route to the bridge including on Lombard Street and Van Ness Avenue. == Issues == ===Suicides=== The Golden Gate Bridge is the most used suicide site in the world.
Until 2008, the bridge was closed because of weather conditions only three times: on December 1, 1951, because of gusts of ; on December 23, 1982, because of winds of ; and on December 3, 1983, because of wind gusts of .
As a condition of the grant, the congestion toll was to be in place by September 2009. In August 2008, transportation officials ended the congestion pricing program in favor of varying rates for metered parking along the route to the bridge including on Lombard Street and Van Ness Avenue. == Issues == ===Suicides=== The Golden Gate Bridge is the most used suicide site in the world.
Construction on the $1 billion replacement, temporarily known as the Presidio Parkway, began in December 2009. The elevated Doyle Drive was demolished on the weekend of April 27–30, 2012, and traffic used a part of the partially completed Presidio Parkway, until it was switched onto the finished Presidio Parkway on the weekend of July 9–12, 2015.
The District later increased the toll amounts in 2008 to $5 for FasTrak users and $6 to those paying cash (equivalent to $ and $ respectively in ). In an effort to save $19.2 million over the following 10 years, the Golden Gate District voted in January 2011 to eliminate all toll takers by 2012 and use only open road tolling.
The Bridge Round House diner was then included in the southeastern end of the Golden Gate Bridge, adjacent to the tourist plaza which was renovated in 2012.
The diner was renovated in 2012 and the gift shop was then removed as a new, official gift shop has been included in the adjacent plaza. During the bridge work, the Assistant Civil Engineer of California Alfred Finnila had overseen the entire iron work of the bridge as well as half of the bridge's road work.
With the death of Jack Balestreri in April 2012, all workers involved in the original construction are now deceased. ===Torsional bracing retrofit=== On December 1, 1951, a windstorm revealed swaying and rolling instabilities of the bridge, resulting in its closure.
It opened in 2012, in time for the bridge's 75th-anniversary celebration.
The District later increased the toll amounts in 2008 to $5 for FasTrak users and $6 to those paying cash (equivalent to $ and $ respectively in ). In an effort to save $19.2 million over the following 10 years, the Golden Gate District voted in January 2011 to eliminate all toll takers by 2012 and use only open road tolling.
Although the retrofit was initially planned to be completed in 2012, it was expected to take several more years. The former elevated approach to the Golden Gate Bridge through the San Francisco Presidio, known as Doyle Drive, dated to 1933 and was named after Frank P.
Construction on the $1 billion replacement, temporarily known as the Presidio Parkway, began in December 2009. The elevated Doyle Drive was demolished on the weekend of April 27–30, 2012, and traffic used a part of the partially completed Presidio Parkway, until it was switched onto the finished Presidio Parkway on the weekend of July 9–12, 2015.
Subsequently, this was delayed and toll taker elimination occurred in March 2013.
Twenty-eight positions were eliminated as part of this plan. On April 7, 2014, the toll for users of FasTrak was increased from $5 to $6 (equivalent to $ in ), while the toll for drivers using either the license plate tolling or the one time payment system was raised from $6 to $7 (equivalent to $ in ).
During off-peak periods and weekends, traffic is split with three lanes in each direction. From 1968 to 2015, opposing traffic was separated by small, plastic pylons; during that time, there were 16 fatalities resulting from 128 head-on collisions.
Installation of the resulting barrier was completed on January 11, 2015, following a closure of 45.5 hours to private vehicle traffic, the longest in the bridge's history.
Construction on the $1 billion replacement, temporarily known as the Presidio Parkway, began in December 2009. The elevated Doyle Drive was demolished on the weekend of April 27–30, 2012, and traffic used a part of the partially completed Presidio Parkway, until it was switched onto the finished Presidio Parkway on the weekend of July 9–12, 2015.
About 5% survive the initial impact but generally drown or die of [in the cold water. After years of debate and an estimated more than 1,500 deaths, suicide barriers, consisting of a stainless steel net extending 20 feet from the bridge and supported by structural steel 20 feet under the walkway, began to be installed in April 2017.
In December 2019, it was reported that construction of the suicide prevention net had fallen two years behind schedule because the lead contractor, Shimmick Construction Co., had been sold in 2017, leading to the slowdown of several existing projects.
In December 2019, it was reported that construction of the suicide prevention net had fallen two years behind schedule because the lead contractor, Shimmick Construction Co., had been sold in 2017, leading to the slowdown of several existing projects.
As of December 2019, the completion date for the Golden Gate Bridge net was set for 2023. ===Wind=== The Golden Gate Bridge was designed to safely withstand winds of up to .
Another anemometer was placed on one of the towers. As part of the retrofitting of the bridge and installation of the suicide barrier, starting in 2019 the railings on the west side of the pedestrian walkway were replaced with thinner, more flexible slats in order to improve the bridge's aerodynamic tolerance of high wind to .
Starting in June 2020, reports were received of a loud hum, heard across San Francisco and Marin County, produced by the new railing slats when a strong west wind was blowing.