In between is the Félou Hydroelectric Plant, built in 1927, but replaced in 2014.
After 200 km the two branches rejoin a few kilometers downstream of Pondor. In 1972 Mali, Mauritania and Senegal founded the Organisation pour la mise en valeur du fleuve Sénégal (OMVS) to manage the river basin.
Guinea joined in 2005.
The construction of the Gouina Hydroelectric Plant upstream of Felou at Gouina Falls began in 2013. == Geography == The Senegal's [are the
In between is the Félou Hydroelectric Plant, built in 1927, but replaced in 2014.
All text is taken from Wikipedia. Text is available under the Creative Commons Attribution-ShareAlike License .
Page generated on 2021-08-05